This stunning external renovation brings the timeless elegance of Hamptons-style living to life, creating a luxurious yet functional outdoor space perfect for relaxation and entertaining.
A beautiful hardwood deck extends from the house, seamlessly blending indoor and outdoor living while enhancing the property’s overall aesthetic. At the end of the pool, a secondary hardwood deck provides the perfect spot for lounging, capturing both sun and serenity.
To maximise natural light while offering shade, a stylish pergola was built to frame the space, creating an inviting atmosphere that feels open and airy. The addition of a bespoke BBQ area transforms this outdoor retreat into an entertainer’s dream, offering the ideal setting for hosting family and friends.
Designed with both beauty and practicality in mind, this renovation embodies effortless Hamptons sophistication while enhancing the home’s outdoor functionality.