This architectural home in Clontarf provided the perfect canvas to enhance its features with timber accents on the home’s exterior coupled with a timber pergola to blend aesthetics with the natural surroundings.
Our client loved the look of hardwood but did not want the maintenance that comes with timber. Our solution was a high-quality timber-look product (Trex composite) designed to last 25 years plus without maintenance. The pergola was built around the existing plants/garden to preserve the property’s beautiful foliage.
The result is an incredibly eye-catching home that’s often talked about and one very happy client who can enjoy the surroundings (and not the upkeep).